You don't have javascript enabled. Good luck with that.
Pencarian
Kereta LRT Ditarget Beroperasi April

LRT to Officially Serve Jakartans in April

The operational of the phase I Light Rail Transit (LRT) route Kelapa Gading - Velodrome is targeted in the forthcoming April.

We plan to hold trial run by the end of February

PT LRT Jakarta Project Director, Iwan Takwin said, thus far, the six stations construction has touched 97 percent, namely Pegangsaan Dua Station at LRT Depot, Kelapa Gading Mall Station (North Boulevard), South Boulevard Station, Pulomas Station, Equestrian Station, and Velodrome Station.

Dishub Invites Stakeholders to Have Discussion Regarding LRT Jakarta

"We've entered finishing and lift trial stages," he expressed, Wednesday (1/9). 

Several LRT operational preparations are also being conducted prior to operational. Among them are finalization of signaling systems, preparation of supporting facilities and infrastructure such as stations, etc.

"We plan to hold trial run by the end of February," he stated.

Linked News
Popular News indeks
  1. Transjakarta Modifies Mikrotrans Routes JAK 48A, JAK 50, and JAK 79

    access_time12-10-2026 remove_red_eye540 personAldi Geri Lumban Tobing
  2. Way to Go, Kid! Transjakarta Surprises Young Local Commuter in East Jakarta

    access_time11-10-2026 remove_red_eye464 personAldi Geri Lumban Tobing
  3. Dengue Cases Decline in Jakarta as Prevention Efforts Intensify

    access_time16-10-2026 remove_red_eye409 personAldi Geri Lumban Tobing
  4. CiLung Festival Lets Visitors Ride Boats Made from Recycled Plastic Bottles

    access_time16-10-2026 remove_red_eye399 personAldi Geri Lumban Tobing
  5. Jakarta Sends Transport Personnel to Street Level to Clear Morning Rush-Hour Jams

    access_time11-10-2026 remove_red_eye385 personAldi Geri Lumban Tobing